1227
Home Interior Exterior Renovation
Install new base cabinet.
Install new cabinets hardwares
Resurface kitchen & bathroom cabinets.
Resurface bathroom tubs.
Remove and install light fixtures.
Install new fans.
Install new pre fabricated countertop.
Remove wall papers.
Repair drywall walls.
Install luxury vinyl flooring throughout house.
Install new quarter round molding.
Paint interior walls, ceiling & doors.
Install 3 new toilet bowls.
Frame one wall in garage.
Hang and finish drywall in garage.
Secure block with cement in garage.
Remove and rebuild front entrance
stairway.
Paint garage floor.
Install new entry door.
Paint entire exterior house.
Remove debris from project.
Material cost ~
Labor cost ~
Thank you; we really appreciate your business.
A 50% downpayment is required to commence, 25% to be paid when the job is at 50%, the final balance to be paid upon completion.
Status changed: Draft to Pending.
Estimate viewed by 34.122.209.142 for the first time.
Estimate viewed by 35.223.220.99 for the first time.
Estimate viewed by for the first time.
Estimate viewed by Crystal (Crystal) for the first time.
Estimate viewed by 38.132.98.214 for the first time.
Estimate viewed by 85.25.177.176 for the first time.
Estimate viewed by 43.173.173.58 for the first time.
Estimate viewed by 188.138.9.93 for the first time.
Estimate viewed by 3.83.76.234 for the first time.