1175
Framing
Correct deck post footings to meet code.
Correct deck railings and post to meet code.
Seal deck flashing at the top to prevent water from damaging ledger and rim joists.
Frame beam and joists in attic to meet
code.
Install joist hangers.
Extend 2 columns in kitchen to meet code.
Cost ~ Labor only
Thank you; we really appreciate your business.
A 50% deposit is required to be paid halfway the project, the other 50% tp be paid upon completion.
Status changed: Pending to Draft.
Status changed: Draft to Pending.
Invoice viewed by 104.28.32.197 for the first time.